New — the Gatekeeper engine now cites CDM 2015 and OSHA clauses inline. See how it works →

Construction & HSE compliance

Method statements,
audit-ready by default.

HoldPoint turns scope into a structured RAMS, checks every hazard and control against a compliance engine, and keeps the signed, citable record an inspector will accept.

holdpoint
Live
Document status
DRAFT · v3
5 hazards
HP-26-0419 L×S = 12
Working at Height — Steel Frame Erection
Method statement · UK CDM 2015 · Site: Branxton Phase 2
Hazard & control review — completeness
  • H1Fall from height — guardrails & harness anchor points
  • H2Dropped objects — exclusion zone & tool tethering
  • H3Mobile plant interface — banksman & segregation
  • H4Adverse weather — wind speed hold point at 23 mph
  • H5Manual handling — mechanical lift for sections >25 kg
Completeness 2/5

↑ Tick a hazard control to update completeness

Built for the people accountable for safety on site

MERIDIAN BUILDCostain GroupBALFOUR CIVILSAquaWorks Severn Fit-OutHardHat HSETIDAL UKCatchment Co

Representative logos — placeholder content.

AI-powered RAMS creation

From scope to a
structured RAMS.

Describe the task, site and personnel. HoldPoint's engineering engine drafts a sequenced method statement and a hazard-by-hazard risk assessment — structured, not a wall of text.

Learn more →

Engineering sequence

Ordered method steps from the task scope.

Hazard & control pairs

Every hazard met with a scored control.

COSHH & personnel

Substances and roles captured up front.

Replaces blank Word templates · copy-paste from old RAMS · guesswork
Engineering engine
✦ Drafting
Scope · 3 tasks · 4 personnelUK CDM 2015
Method statement — HP-26-0419

Gatekeeper compliance engine

Nothing ships until
it holds up.

The Gatekeeper checks every document against the regulatory corpus — legislation, ACOPs and client rules — and returns a verdict with cited findings, tiered by severity, before a single signature.

Learn more →

Cited verdicts

Findings reference the exact clause.

Blocking or advisory

Gate sign-off, or inform without blocking.

Jurisdiction-aware

UK and US corpora never cross over.

Replaces manual peer review · missed clauses · audit panic
Gatekeeper · HP-26-0419
Checking
Verdict
Approved with conditions
2 to fix
  • CHKWAH Regs 2005 reg 6 cited for guardrails
  • CHKRisk scores within tolerance after controls
  • CHKWind-speed hold point added to lift plan
  • CHKCOSHH entries complete for sealants
Digital approval chains

Sign-off that
actually proves it.

Route documents through sequential or parallel approval chains. Each signature is a SHA-256 hash of document, signer and timestamp — and external reviewers approve through a secure, token-gated portal.

Learn more →

Sequential or parallel

Model the chain your client demands.

Cryptographic signatures

Hashed, attributed, tamper-evident.

External reviewer portal

No login — a secure token link.

Replaces email approvals · scanned signatures · version chaos
Approval queue
Today
Awaiting 3
HP-26-0420Hot works — pipe spool
HP-26-0421Scaffold inspection
HP-26-0422Lift plan — chiller
J. Patel Reviewer
HP-26-0419Working at height
+ Next in chain · M. Cole
Signed SHA-256
HP-26-0411Confined space entry
Audit-ready exports

A record an inspector
will accept.

Every action is time-stamped and attributed. Export the full pack — method statement, risk assessment, COSHH, signatures and audit trail — as a CDM 2015 or OSHA-formatted PDF or DOCX, on demand.

Learn more →

Full audit trail

Who, what, when — captured automatically.

PDF & DOCX

CDM 2015 or OSHA section templates.

Versioned forever

Every revision and signature retained.

Replaces shared drives · chasing paperwork · "which version?"
Audit trail
Verified
  • RAMS generated — engineering + governanceHP-26-0411 · 11:02
  • Gatekeeper verdict — APPROVED0 critical · 0 important · 11:19
  • Signed — sequential chain of 3SHA-256 hashed · 14:40
  • Distributed to siteBranxton Phase 2 · 14:42
Audit pack generatedHP-26-0411 · audit-ready · PDF + DOCX

“The Gatekeeper catches the missing citations before the client ever sees the document. Our review cycle went from days to a single pass.”

RBCompliance placeholderCompliance Officer · Principal contractor

“Writing a RAMS used to eat an afternoon. Now I describe the task and spend my time reviewing controls, not formatting Word.”

SPSafety placeholderH&S Manager · Civil engineering

“When the HSE asked for the record, it was one export. Method statement, risk assessment, signatures, audit trail — all of it.”

DMSite placeholderSite Supervisor · Fit-out

…and signed off with confidence.

Join the safety teams replacing template chaos with HoldPoint.

Placeholder quotes — for illustration.

Live across every site

RAMS generated
Hazards assessed
Compliance checks run

Illustrative figures.

Ready to make every
document audit-ready?

See HoldPoint on your own RAMS in a 30-minute walkthrough.

Book a demo →

No rip-and-replace. Works alongside your existing templates and sign-off chain.