Construction & HSE compliance
Method statements,
audit-ready by default.
HoldPoint turns scope into a structured RAMS, checks every hazard and control against a compliance engine, and keeps the signed, citable record an inspector will accept.
- ✓H1Fall from height — guardrails & harness anchor points
- ✓H2Dropped objects — exclusion zone & tool tethering
- ✓H3Mobile plant interface — banksman & segregation
- ✓H4Adverse weather — wind speed hold point at 23 mph
- ✓H5Manual handling — mechanical lift for sections >25 kg
↑ Tick a hazard control to update completeness
- IMPORTANT — STEP 4.2Cite WAH Regs 2005 reg 6 for the guardrail control measure.
- IMPORTANT — STEP 7.1Add wind-speed hold point to the lift plan, not just the risk row.
- OPTIONAL — STEP 2.4Reference the site induction record for named operatives.
↑ Tap a status step to advance the hold point
- RAMS approved — HP-26-0411J. Patel · 14:38 · sequential chain
- Gatekeeper verdict — APPROVEDGatekeeper v2.0 · 0 critical · 14:31
- Signatures captured — 3 of 3SHA-256 hashed · 14:40
Built for the people accountable for safety on site
Representative logos — placeholder content.
From scope to a
structured RAMS.
Describe the task, site and personnel. HoldPoint's engineering engine drafts a sequenced method statement and a hazard-by-hazard risk assessment — structured, not a wall of text.
Learn more →Engineering sequence
Ordered method steps from the task scope.
Hazard & control pairs
Every hazard met with a scored control.
COSHH & personnel
Substances and roles captured up front.
Nothing ships until
it holds up.
The Gatekeeper checks every document against the regulatory corpus — legislation, ACOPs and client rules — and returns a verdict with cited findings, tiered by severity, before a single signature.
Learn more →Cited verdicts
Findings reference the exact clause.
Blocking or advisory
Gate sign-off, or inform without blocking.
Jurisdiction-aware
UK and US corpora never cross over.
- ✓CHKWAH Regs 2005 reg 6 cited for guardrails
- ✓CHKRisk scores within tolerance after controls
- ✓CHKWind-speed hold point added to lift plan
- ✓CHKCOSHH entries complete for sealants
Sign-off that
actually proves it.
Route documents through sequential or parallel approval chains. Each signature is a SHA-256 hash of document, signer and timestamp — and external reviewers approve through a secure, token-gated portal.
Learn more →Sequential or parallel
Model the chain your client demands.
Cryptographic signatures
Hashed, attributed, tamper-evident.
External reviewer portal
No login — a secure token link.
A record an inspector
will accept.
Every action is time-stamped and attributed. Export the full pack — method statement, risk assessment, COSHH, signatures and audit trail — as a CDM 2015 or OSHA-formatted PDF or DOCX, on demand.
Learn more →Full audit trail
Who, what, when — captured automatically.
PDF & DOCX
CDM 2015 or OSHA section templates.
Versioned forever
Every revision and signature retained.
- RAMS generated — engineering + governanceHP-26-0411 · 11:02
- Gatekeeper verdict — APPROVED0 critical · 0 important · 11:19
- Signed — sequential chain of 3SHA-256 hashed · 14:40
- Distributed to siteBranxton Phase 2 · 14:42
“The Gatekeeper catches the missing citations before the client ever sees the document. Our review cycle went from days to a single pass.”
“Writing a RAMS used to eat an afternoon. Now I describe the task and spend my time reviewing controls, not formatting Word.”
“When the HSE asked for the record, it was one export. Method statement, risk assessment, signatures, audit trail — all of it.”
…and signed off with confidence.
Join the safety teams replacing template chaos with HoldPoint.
Placeholder quotes — for illustration.
Live across every site
Illustrative figures.
Ready to make every
document audit-ready?
See HoldPoint on your own RAMS in a 30-minute walkthrough.
Book a demo →No rip-and-replace. Works alongside your existing templates and sign-off chain.